TravelTill

Economy of Romania


JuteVilla
to other countries in Eastern Europe, but still underdeveloped compared to Western European standards. There are 17 commercial airports in service today, most of them opened for international traffic. Five of the airports (OTP, BBU, TSR, CND, SBZ) have runways of over 3,000 meters in length and are capable of handling wide-body aircraft. Three of the airports (BCM, CRA, SUJ) have runways of 2,500 meters in length, while the rest of them have runways of 1,800 to 2,000 meters. As of December 2006, TCE and CSB are the only airports with no regular flights. Almost all the airports have experienced traffic growth in the last 4 years.

The World Bank estimates that the railway network in Romania comprised 22,298 kilometres (13,855 mi) of track in 2004, which would make it the fourth largest railroad network in Europe. The railway transport experienced a dramatic fall in freight and passenger volumes from the peak volumes recorded in 1989 mainly due to the decline in GDP and competition from road transport. In 2004, the railways carried 8.64 billion passenger-km in 99 million passenger journeys, and 73 million metric tonnes, or 17 billion ton-km of freight. The combined total transportation by rail constituted around 45% of all passenger and freight movement in the country.

Bucharest is the only city in Romania which has an underground railway system. The Bucharest Metro was opened in 16 November 1979 and is now one of the most accessed systems of the Bucharest public transport network with an average ridership of 600,000 passengers during the workweek. Currently, the Bucharest Metro measures 61.41 km lengthwise and includes five metro lines, one proposed and one under construction.

Romania has 16 international airports, of which the busiest are Henri Coandă International Airport (4,917,952 passengers, 2010) and Aurel Vlaicu International Airport (2,118,150 passengers, 2010). Also, Romania disposes of an unworkable international airport (Caransebeș
JuteVilla