TravelTill

Economy of Kitwe


JuteVilla
at Nkana, and has achieved significant production increases at its underground mining operations in Kitwe and Mufulira. Copper production from internal sources was supplemented by the purchase of some 18,000 tons of copper in high-grade oxide concentrate bought from the Democratic Republic of the Congo. The company aims to rebuild the Mufulira smelter during 2004 and 2005, and also plans to add a new gas collection facility and acid plant at a total cost of US$95 million.

The largest underground mine in Africa, the Mufulira Mine employs 10,000 people; includes a concentrator, a refinery and a smelter; and produces 300,000 tons of copper each year through the process of open stopping. The copper is then taken to the concentrator.

The concentrator crushes ores coming from the Mufulira mine consisting of 46% copper, waters it, and then does the process of floatation so the waste material can be removed.

The smelter melts the copper mixed with limestone in the Isasmelt furnace. The copper is pressurised by the air, then oxidised, and finally poled. The copper is then taken to the refinery.

The copper is cast into anodes so the process of electrolysis can take place during refining.

Nkana mine is one of the largest in Africa, a copper mine located 1 km south-west of Kitwe. The mine is underground as well as open pit and is in operation since 1932 and has produced 6,000,000 tons of copper so far. Its reserves underground include 69,000,000 tons of grading, 16,000,000 tons of copper, and 98,000 tons of cobalt. Its resources include 126,000,000 tons of grading, 43,000,000 tons of copper, and 300,000 tons of cobalt. Copper and cobalt mineralisation occur within the ore shale. Copper mineralisation in the deposits changes from mostly chalcopyrite in the South Orebody, to

JuteVilla