On arriving into Baltra, all visitors are transported by bus to one of two docks. The first dock is located in a small bay where the boats cruising the Galápagos await passengers. The second is a ferry dock which connects Baltra to the island of Santa Cruz via the Itabaca Channel.
Constructions for a larger, modernized airport began in 2011, and as of early 2013 it has started operation and the old buildings are being dismantled. The new airport is being run under a 15-year concession by ECOGAL, a subsidiary of the Argentinian group Corporación América and has been promoted as "the first ecological airport worldwide" due to its reduced energy consumption for lighting and ventilation, rainwater recovery, waste recycling etc
Embassy Locator | Contact Us | Privacy Policy | Terms of Use | My Bookings
© 2012-2023 Traveltill.com. All rights reserved.